+91 9979910501
No products in the cart.
Return To ShopNo products in the cart.
Return To Shop₹549.00 Original price was: ₹549.00.₹309.00Current price is: ₹309.00.
8 people are viewing this product right now
🔥 10 items sold in last 3 hours
| Brand | ‎EVM |
|---|---|
| Model | ‎EVM-NEO-3W042 |
| Model Name | ‎Wireless Mouse |
| Product Dimensions | ‎9 x 4 x 0.1 cm, 50 g |
| Item model number | ‎EVM-NEO-3W042 |
| Operating System | ‎Windows 10, Windows 8 |
| Compatible Devices | ‎Laptop, Computer, Smart TV, Projectors |
| Special Features | ‎Wireless |
| Mounting Hardware | ‎USB receiver |
| Number of items | ‎1 |
| Power Source | ‎USB |
| Battery Average Life | ‎12 Months |
| Batteries Included | ‎No |
| Batteries Required | ‎No |
| Connector Type | ‎USB |
| Movement Detection Technology | ‎Optical |
| Hand Orientation | ‎Ambidextrous |
| Manufacturer | ‎‎EVM, EVM INDIA,3F/4F Technology Building,B Block XiXiang Baoan District Shenzhen |
| Country of Origin | ‎China |
| Item Weight | ‎50 g |
| Date First Available | 12 April 2024 |
| Packer | AMRANI INFONET 102,1ST FLOOR, 391, DIAMOND PLAZA BUILDING, Dr. D. B. MARG, LAMINGTON ROAD, MUMBAI-400004 INDIA |
| Importer | EVM |
| Item Dimensions LxWxH | 9 x 4 x 0.1 Centimeters |
| Net Quantity | 1.00 count |
| Generic Name | Wireless Mouse |
₹749.00 Original price was: ₹749.00.₹289.00Current price is: ₹289.00.
₹299.00 Original price was: ₹299.00.₹179.00Current price is: ₹179.00.
At sem a enim eu vulputate nullam convallis Iaculis vitae odio faucibus adipiscing urna.
Reviews
There are no reviews yet.