+91 9979910501
No products in the cart.
Return To ShopNo products in the cart.
Return To Shop₹749.00 Original price was: ₹749.00.₹289.00Current price is: ₹289.00.
43 people are viewing this product right now
🔥 9 items sold in last 3 hours
| Brand | ‎EVM |
|---|---|
| Model | ‎EVM-M06063 |
| Model Name | ‎EVM-M06063 |
| Product Dimensions | ‎12.6 x 3.9 x 0.1 cm, 50 g |
| Item model number | ‎EVM-M06063 |
| Operating System | ‎Android, Chrome OS |
| Compatible Devices | ‎Gaming Console, Laptop, Personal Computer |
| Special Features | ‎Lightweight, Portable |
| Number of items | ‎1 |
| Power Source | ‎Corded Electric |
| Batteries Included | ‎No |
| Batteries Required | ‎No |
| Connector Type | ‎USB |
| Movement Detection Technology | ‎Gyroscopic |
| Material | ‎Plastic |
| Manufacturer | ‎EVM |
| Country of Origin | ‎India |
| Item Weight | ‎50 g |
| Date First Available | 5 December 2024 |
| Packer | AMRANI INFONET 102,1ST FLOOR, 391, DIAMOND PLAZA BUILDING, Dr. D. B. MARG, LAMINGTON ROAD, MUMBAI-400004 INDIA |
| Item Dimensions LxWxH | 12.6 x 3.9 x 0.1 Centimeters |
| Net Quantity | 1.00 count |
| Generic Name | Mouse |
₹1,499.00 Original price was: ₹1,499.00.₹549.00Current price is: ₹549.00.
₹549.00 Original price was: ₹549.00.₹309.00Current price is: ₹309.00.
At sem a enim eu vulputate nullam convallis Iaculis vitae odio faucibus adipiscing urna.
Reviews
There are no reviews yet.